✓Insured Service✓Greater Houston Dispatch
Service · Houston + Fort Bend + RGV

SWPPP & Erosion Control for Houston Construction Sites

Silt fence, rock construction entrance, inlet protection and the permit-schedule inspections, provided on your SolidSite ticket, with inspection qualifications confirmed in the scope.

SolidSite provides swppp & erosion control across Greater Houston through one local dispatcher — Stormwater controls and SWPPP inspections for construction sites, from SolidSite. Scope and pricing confirmed by quote. It rides the same ticket as generator rentals, equipment rentals, restrooms, dumpsters, temporary fence, demolition, concrete, jobsite signage, containers, washout, and cleaning on one PO and one invoice. Same-day dispatch may be available for early Greater Houston orders. The Rio Grande Valley runs on a scheduled or next-day service schedule. Dispatch confirms every window.

60 min
Callback
1 PO
All services
7-day
Dispatch window
HOU
Dispatched
How it works

From call to crew in 4 steps.

  1. 01

    Tell Us the Site

    Send the address or ZIP, what you need, quantities and dates. Photos or a site plan help.

  2. 02

    Get a Confirmed Quote

    We confirm availability, scope, pricing and terms in writing before anything is booked.

  3. 03

    Schedule It

    Approve the quote and confirm the site contact, access and timing with SolidSite.

  4. 04

    One Ticket

    It rides the same order and invoice as your dumpsters, restrooms and fence.

What's in the rate

Included. No add-ons.

The quote you get is the invoice you'll pay. If a line item isn't on this list and it's not disclosed upfront, you don't pay for it.

  • Scope review from your plans or site walk
  • Written quote for install, inspections and maintenance
  • Inspection qualifications and reporting requirements confirmed
  • One invoice with your other site services
Ready when you are

Need swppp? Check availability.

Who books this

Crews we run swppp for.

General contractors

Controls and inspections on commercial and retail pads

Site and civil contractors

BMP install and maintenance through sitework

Developers and owners

Keeping the permit file current for the life of the job

Real jobs · real sizing

If your job looks like this.

Retail pad over an acre

Scenario

A new drive-thru pad disturbs about 1.3 acres.

What we'd send

Perimeter silt fence, a rock entrance, inlet protection and a washout, with inspections on the permit schedule until final stabilization.

The deep dive

How we run swppp.

Sites that disturb an acre or more generally fall under the TCEQ Construction General Permit, which calls for a stormwater pollution prevention plan, installed controls and inspections for the life of the job. SolidSite provides a scope covering plan preparation, silt fence, stabilized construction entrances, inlet protection, concrete washout, maintenance after rain and inspection reports. Send the plan sheets or site address and the disturbed acreage. We confirm the scope, inspection schedule and pricing in writing before anything is installed.
Straight answers

SWPPP FAQ

Questions we get from Houston, Fort Bend, and RGV crews about swppp & erosion control.

Does my site need a SWPPP?
Generally, yes if the job disturbs an acre or more, or is part of a larger development that does. Your civil engineer or permit documents confirm it for your site.
Who performs the inspections?
Qualified personnel perform and sign the inspections. We confirm the required qualifications and inspection scope before work starts, on one SolidSite ticket and invoice.
Can you install the silt fence and entrance too?
Yes. Install, maintenance after rain and removal at closeout are quoted together with the inspections.

Ready to book? One call, the whole site.

Call dispatchGet a quote →
Call a RepGet a Quote →